Open Up a Load-Bearing Wall
Renovation●●●Advanced3-5 days

Open Up a Load-Bearing Wall

Removing a wall between a kitchen and living area is one of the most dramatic renovations you can do. This is an advanced project that requires a temporary bearing wall, a properly sized header, and in most jurisdictions, a permit and inspection. The result is a brighter, more connected home.

Step by step

  1. 1

    Confirm permits and engineering

    Have a structural engineer size the beam. Pull a permit from your local building department before any demolition begins.

  2. 2

    Build a temporary bearing wall

    Construct a temporary 2x4 wall 3-4 feet from the existing wall to carry the load during the work. Use a header and sole plate, not just studs.

  3. 3

    Demo the existing wall

    Score the drywall at the edges, then rip it down in sections. Cut lath or drywall away from the framing, then remove studs in pairs.

  4. 4

    Install king and jack studs

    Cut and nail king studs that run full height. Install jack studs tight under the beam location on each side of the opening.

  5. 5

    Set the header beam

    Lift the beam into place with help. Check for level, shim as needed, and secure with structural screws or through-bolts per the engineer's spec.

  6. 6

    Close up and finish

    Patch drywall on the ceiling, tape and mud the seams, then prime and paint. Inspect before closing up the walls.